The customer had a conventional bathroom but wanted to split it in two, in order to create a shower room and a bathroom with separate entrances. Also the old boiler cylinder system was to be replaced with a new combi boiler. We removed all fittings, walls, and pipe work and rebuilt the new room from scratch. We created the footprint of the two new rooms out of stud work and ran in the pipe work, electrics and waste. After plaster boarding the stud work we proceeded to plaster all walls and ceilings. Floors and walls were tiled where needed, and the new bathroom and shower room suites were installed. The old sash window was replaced a new UPVC one and a good coat of paint was applied.